Deprecated: /home/lqlrqu6t330m/public_html/gassector.com/wp-content/plugins/wordpress-seo/src/deprecated/src/presenters/open-graph/fb-app-id-presenter.php is deprecated since version WPSEO 15.5 with no alternative available. in /home/lqlrqu6t330m/public_html/gassector.com/wp-includes/functions.php on line 5061
Osisko Metals hires BBA for Pine Point greenhouse gas estimate - GASSECTOR.com

Osisko Metals hires BBA for Pine Point greenhouse gas estimate

While the scope 1 analysis is underway, Osisko will also launch several trade-off studies to identify potential alternative energy sources to hydro. These include natural gas-fired generation, wind power and geothermal energy.

Osisko drill programs have outlined an indicated resource of 12.9 million tonnes grading 4.6% zinc and 1.7% lead. The inferred portion is 37.9 million tonnes at 4.9% zinc and 1.9% lead. Osisko’s drilling this year in the East Mill zone extended mineralization between separate open pits and increased tonnage by 13%.

(This article first appeared in the Canadian Mining Journal)

READ MORE: https://www.mining.com/osisko-metals-hires-bba-for-pine-point-greenhouse-gas-estimate/